How to install the cable tray on the highway

  • Categories:Zhongrui News
  • Author:
  • Origin:
  • Time of issue:2019-05-28 14:35
  • Views:

(Summary description)Cable trays are widely used and are also used on highways. How is it installed on the highway? (1) When the trough type large span cable tray is entered into the building from the outside, the slope of the bridge shall not be less than 1/100. (2) When the cable tray is crossed with the electrical equipment, the clearance between them is not less than 0.5m. (3) When the two sets of cable trays are laid in parallel at the same height, the clearance between them is not less than 0.6m.

How to install the cable tray on the highway

(Summary description)Cable trays are widely used and are also used on highways. How is it installed on the highway?

(1) When the trough type large span cable tray is entered into the building from the outside, the slope of the bridge shall not be less than 1/100.

(2) When the cable tray is crossed with the electrical equipment, the clearance between them is not less than 0.5m.

(3) When the two sets of cable trays are laid in parallel at the same height, the clearance between them is not less than 0.6m.

  • Categories:Zhongrui News
  • Author:
  • Origin:
  • Time of issue:2019-05-28 14:35
  • Views:
Information
Cable trays are widely used and are also used on highways. How is it installed on the highway?
 
(1) When the trough type large span cable tray is entered into the building from the outside, the slope of the bridge shall not be less than 1/100.
 
(2) When the cable tray is crossed with the electrical equipment, the clearance between them is not less than 0.5m.
 
(3) When the two sets of cable trays are laid in parallel at the same height, the clearance between them is not less than 0.6m.
 
(4) Draw the route of the bridge on the parallel diagram, and indicate the coordinates or positioning size and elevation of the starting point, the end point, the turning point, the branch point and the lifting point of the bridge. If the side view of the bridge laying axis can be drawn, the material statistics are Will be more precise. Straight line segment: Indicate the full length, number of decks, elevation, model and specifications. Turning points and branch points: Indicate the model and specifications of the turning board used. Lifting section: indicate the elevation change, or it can be represented by a local large sample or sectional view.
 
(5) The support points of the bridge, such as the column, the arm or the non-standard branch, the spacing of the frame, the installation method, the model specification, and the elevation, can be agreed to be listed on the plane, or the sections can be marked with different sections and single lines. Figure or large sample representation.
 
(6) The position of the cable lead-down point and the way of guiding it down. Generally speaking, a large number of cables can be led down by a vertical bent plate and a vertical lead frame. A small number of cables can be used to guide the guide plate or the lead pipe.

Scan the QR code to read on your phone

ABOUT US

 

 

Introduction

 

Business

 

Win-win

 

Advantage

 

Contact us

NEWS

 

 

Zhongrui News

 

Industry

 

FAQ

 

Support

 

CONTACT US

Add:92 Weier Road, Chengbei Park, Jingjiang Economic and Technological Development Zone, Jiangsu Province 

Phone

Mobile version