logo

DETAILS

Check category

Cable tray replacement principle

  • Categories:Zhongrui News
  • Author:
  • Origin:
  • Time of issue:2019-05-28 14:27
  • Views:

(Summary description)电缆桥架在使用一段时间之后出现腐蚀老化等现象,必须进行更换,否则就会出现各种安全隐患,如何不及时处理,可能会造成不可预想的灾难,给人民带来生命财产上的重大威胁,那么在更换时,我们的施工人员都要经过哪些步骤,要怎么操作才能保证施工人员的安全呢,首先在更换工作开始之前,要进行会议研讨,制定出一套严格的安全措施和施工方案,要经过机动部进行审核,审核通过之后开始准备各种工具,材料,进行人员的分配,安排好各

Cable tray replacement principle

(Summary description)电缆桥架在使用一段时间之后出现腐蚀老化等现象,必须进行更换,否则就会出现各种安全隐患,如何不及时处理,可能会造成不可预想的灾难,给人民带来生命财产上的重大威胁,那么在更换时,我们的施工人员都要经过哪些步骤,要怎么操作才能保证施工人员的安全呢,首先在更换工作开始之前,要进行会议研讨,制定出一套严格的安全措施和施工方案,要经过机动部进行审核,审核通过之后开始准备各种工具,材料,进行人员的分配,安排好各

  • Categories:Zhongrui News
  • Author:
  • Origin:
  • Time of issue:2019-05-28 14:27
  • Views:
Information

After the cable tray is used for a period of time, it will be corroded and aging. It must be replaced. Otherwise, various safety hazards will occur. How to deal with it in time may cause unpredictable disasters and bring great threats to people and lives. Then, when replacing, what steps should our construction personnel go through, and how can we ensure the safety of the construction workers? First, before the start of the replacement work, we should conduct a meeting discussion and develop a set of strict safety measures and construction plans. It is necessary to go through the review by the Mobilization Department. After the approval, all kinds of tools and materials will be prepared, and the personnel will be assigned and the specific responsible matters of each person will be arranged. Before starting construction, go to the construction site for field visits, determine which bridges need to be replaced, develop forms, and make detailed records. Work started after everything was ready. Lifting straps are used during lifting to prevent damage to the construction crew and intact cables. During the replacement process, special personnel should be protected to prevent people unrelated to the operation from approaching the construction site. Remove the corroded cable tray and install a new cable tray. Return the cable to its original position, replace the section, and after everything is the same, perform another section replacement.

Scan the QR code to read on your phone

ABOUT US

 

 

Introduction

 

Business

 

Win-win

 

Advantage

 

Contact us

NEWS

 

 

Zhongrui News

 

Industry

 

FAQ

 

Support

 

CONTACT US

Add:92 Weier Road, Chengbei Park, Jingjiang Economic and Technological Development Zone, Jiangsu Province 

Phone

Mobile version