Enclosed busway installation

  • Categories:Zhongrui News
  • Author:
  • Origin:
  • Time of issue:2019-05-29 17:26
  • Views:

(Summary description)I. Construction time The installation of the enclosed busway is carried out at the end of the three constructions (electrical shaft, power distribution room, and the place where the busbar passes). This ensures that the enclosed busway is not polluted. Before this, the reserved holes and embedded parts of the slab and the wall should be reserved for the position required by the design. Two: installation order:

Enclosed busway installation

(Summary description)I. Construction time The installation of the enclosed busway is carried out at the end of the three constructions (electrical shaft, power distribution room, and the place where the busbar passes). This ensures that the enclosed busway is not polluted. Before this, the reserved holes and embedded parts of the slab and the wall should be reserved for the position required by the design.

Two: installation order:

  • Categories:Zhongrui News
  • Author:
  • Origin:
  • Time of issue:2019-05-29 17:26
  • Views:
Information
I. Construction time The installation of the enclosed busway is carried out at the end of the three constructions (electrical shaft, power distribution room, and the place where the busbar passes). This ensures that the enclosed busway is not polluted. Before this, the reserved holes and embedded parts of the slab and the wall should be reserved for the position required by the design.
 
Two: installation order:
 
1) The most important thing is the direction of the selected wiring
 
2) Fixing bracket If the bracket is not fixed, it will cause danger in the later stage.
 
3) Fasten the four slots with the slots
 
4) Must clean the busbar connector and the inside of the cable duct
 
5) Then add the busbar connector board and insulation pad
 
6) Single head bolt penetrates the insulating sleeve
 
7) After the alignment, insert the bolt into the busbar pre-positioning hole
 
8) Protection of the outer casing: fastening at both ends plus half-mounted upper and lower covers
 
9) Finally fix the busbar to the bracket.

Scan the QR code to read on your phone

ABOUT US

 

 

Introduction

 

Business

 

Win-win

 

Advantage

 

Contact us

NEWS

 

 

Zhongrui News

 

Industry

 

FAQ

 

Support

 

CONTACT US

Add:92 Weier Road, Chengbei Park, Jingjiang Economic and Technological Development Zone, Jiangsu Province 

Phone

Mobile version